Search

Power Management System for ships

Das Bild zeigt ein Eisbrecher Schiff in der Antarktis
Distribute energy, protect the onboard power grid, save fuel

What our power management system is used for

Das Bild zeigt ein großes 32" Touchscreen Display mit Power Management Software für Generatoren
Distribute energy, protect the onboard power grid, save fuel

What our power management system is used for

Our Power Management System (PMS) noriSync for ships is an integrated system that monitors, controls, and optimises the distribution of energy on board. It regulates the load distribution and synchronisation of generators with the onboard power grid, adjusting the power output of generators to match current consumption or load.

noriSync ensures that generators on ships operate at optimal efficiency, which can reduce fuel consumption and emissions. It is a flexible and scalable solution, suitable for all types of ships.

Reduce emissions with noriSync

Benefits of noriSync

Reduce emissions with noriSync

Benefits of noriSync

  • Improve your energy balance: Reduce energy consumption and lower your energy costs
  • Avoid blackouts by securely controlling critical loads
  • Reduce investment costs
  • Protect generators and other electrical equipment through monitoring for safe operation
More power through intelligent control

Technology and design of the power management system

The heart of the power management system

The power management controller

Das Bild zeigt einen Power Magament Controller
The heart of the power management system

The power management controller

The power management controller (PMC) can be used as a standalone system and enhanced with a touchscreen display for visualisation. With additional components from our automation platform, complex systems can be controlled using the controller.

With approvals from maritime classification societies

For isolated operation or parallel operation

Das Bild zeigt ein großes 32" Touchscreen Display mit Power Management Software für Generatoren
With approvals from maritime classification societies

For isolated operation or parallel operation

The core of the power management controller is an ARM 32-bit Cortex™-M4 processor. In its basic configuration, the controller is used for connecting and disconnecting generators to and from the grid, and is also suitable for use in emergency power systems. It is of course approved by ABS, BV, DNV, LR, NK, and KR (others available on request).

Ideal for modern grid architectures with energy storage systems

Functions of noriSync

Das Bild zeigt einen Power Magament Controller
  • Various operating modes
  • Automatic synchronisation
  • Automated start and stop of generators
  • Automatic load distribution
  • Analysis and monitoring of loads
  • Intelligent control of energy storage systems
  • Redundant energy distribution
  • CPU-based multi-master system for flexible system scaling
  • System security through redundant communication
Competent and non-binding

Consultancy by experts

Competent and non-binding

Consultancy by experts

Are you planning a project and looking for customised solutions? Discuss your ideas and goals with us. 

Our experts look forward to providing you with comprehensive advice and a non-binding quotation. We will help you turn your visions into reality.

☎ +49 911 3201 220

sales@noris-group.com

News

99 years young

We, the Noris Group, founded in 1925, have every reason to celebrate: 99 years of Noris!

The image shows the christening of the wallaby boat

Robert Habeck as godfather of the first Wallaby Boat "Impulse"

Robert Habeck as Godfather! How cool is that? April 22, 2024: Excitement fills the air at the Port of Kappeln. Today, it was officially christened as "Impulse".

Launch of the first new Wallaby Boat

An exciting day at the Hitzler Werft GmbH: many guests followed the invitation to Lauenburg at the Elbe to watch and celebrate the launch of the new Wallaby Boat.

The daily work of our service technicians

Insights from the day-to-day business from one of our service technicians. Good service is the be-all and end-all! We look after our projects from the very beginning…

The image shows the headquarters of Noris Group Nuremberg, drone view

Better environmental balance for our headquarters

Green since 1925 - at least our company name is. High time to do it justice. Our goal for 2023: To become more sustainable and increase environmental friendliness at Noris. 

Das Bild zeigt einen Screenshot von ein Schwimmdock.

On a dive - automation done differently

One of our latest projects, in this case for Saudi Aramco, revolves around an unusual refit, because this time we are not on the ship, but underneath it.